Thank you for taking the time to respond to the recent consultation carried out for the proposed road safety improvements around Clermiston Primary School.
The detailed design work is underway. We anticipate that it should be possible to have these improvements constructed in the school summer holidays.
The attached PDF addresses the issues raised through this consultation.
Please do not hesitate to contact me if you require additional information on this proposal.
Stacey Monteith-Skelton
Senior Engineer (Road Safety)
Please note the consultation deadline has been extended due to the Coronavirus outbreak.
The Council proposes to install the following improvements:
Parkgrove Street
Parkgrove Terrace
A preliminary plan of the proposed improvements has been developed and we now wish to obtain the views of the local community.
The proposals can be viewed via the PDF links at the bottom of this page.
Share
Share on Twitter Share on Facebook